
The Challenge
Operating theatres and patient wards demanding strict IAQ, pressurization and redundancy — with infection-control compliance.
Our Solution
Specialized HVAC zoning, HEPA filtration, and fully redundant MEP systems coordinated in Revit with the architectural team.
The Results
- ISO 14644-compliant clean zones
- 99.9% uptime on critical systems
- Full BIM handover for facilities team

