
The Challenge
A 24-storey tower needing a low-energy HVAC backbone with tight floor-to-floor heights and zero tolerance for rework.
Our Solution
Full Revit-coordinated VRF and DOAS design with prefabricated spiral duct risers, delivered clash-free to the mechanical contractor.
The Results
- Zero major clashes at installation
- 31% lower energy use vs. baseline
- Delivered 3 weeks ahead of schedule

